MORE THAN 100 GENERATORS SETS

General Mercantile, a leading supplier of power solutions, collaborated with Awash Bank to provide more than 100 generator sets, aiming to enhance the bank's power infrastructure and ensure uninterrupted operations.


Background:

Awash Bank, one of the largest banks in the region, identified the need for a robust power backup system to address frequent power outages and ensure continuous services to its customers. General Mercantile was approached for its expertise in power solutions.


Objectives:


Provide reliable power backup for Awash Bank branches.

Ensure uninterrupted banking operations during power outages.

Enhance the overall efficiency and reliability of Awash Bank's power infrastructure.

Scope:

General Mercantile supplied and installed over 100 generator sets across multiple Awash Bank branches, tailoring the solutions to meet specific power requirements and local conditions.


Challenges:


Customization: Adapting the generator sets to meet diverse power needs in various locations.

Installation: Ensuring seamless integration with existing power infrastructure.

Maintenance: Implementing a comprehensive maintenance plan for optimal performance.

Implementation:


Site Assessment: General Mercantile conducted a thorough assessment of each Awash Bank branch to determine power needs, environmental conditions, and space constraints.

Customized Solutions: Tailored generator sets were provided, considering factors like power capacity, fuel efficiency, and compliance with local regulations.

Installation and Integration: The generators were strategically installed and seamlessly integrated into Awash Bank's power grid, ensuring a smooth transition between grid and backup power.

Outcome:


Reliable Power Supply: Awash Bank now benefits from a reliable and uninterrupted power supply, minimizing disruptions to banking services.

Cost Efficiency: The customized generator sets offer cost-effective solutions by optimizing fuel consumption and reducing operational costs.

Sustainability: Some generator sets are designed to run 

Client
AWASH BANK
Start Date
02/08/2021
Submit Date
02/09/2021
Category
Supplying Power Generators,