THE GRAND ETHIOPIAN RENAISSANCE DAM CONSTRUCTION IS POWERED BY PRAMAC GENERATORS

Pramac Supplies Power to the Great Ethiopian Renaissance Dam!!! To ensure continuous and reliable power supply, pramac was chosen to provide 16 diesel generators to run for up to 18 hours an day while the dam construction is in progress and supply more than 40 Megawatts of electricity for the remote construction site extending over several kilometers. Each of the pramac geneset has been provided to supply close to 2600 kilovolt-amperes for the construction machinery and other electrical equipment on the building site.
KEY FEATURES GCW2600
• POWER LTP 2570 KVA
• POWER PRP 2310 KVA
 • FREQUENCY 50 HZ
• TENSION 400 V
 • ENGINE MTU 16V4000G63
• ALTERNATOR MARELLI MJB500LA4
• OPEN VERSION
• PARALLEL PANEL

Client
THE GRAND ETHIOPIAN RENAISSANCE DAM
Start Date
02/01/2021
Submit Date
02/02/2021
Category
Construction Machinery